Bus rapid transit (BRT)
Transport Minister inspects 2nd phase of Cairo BRT project
Egypt
July 26, 2026
Transport Minister inspects 2nd phase of Cairo BRT project
Minister of Transport Kamel al-Wazir inspected the second phase of Cairo’s Bus Rapid Transit (BRT) project to review station readiness…
Trial for 2nd phase of BRT project on Ring Road to begin in December
Egypt
October 27, 2025
Trial for 2nd phase of BRT project on Ring Road to begin in December
An informed source revealed that the trial operation of the second phase of the BRT project on the Ring Road…
Ticket prices for the Bus Rapid Transit system in Egypt, starting from LE5
Egypt
May 21, 2025
Ticket prices for the Bus Rapid Transit system in Egypt, starting from LE5
The Egyptian Transport Ministry announced ticket prices of the Bus Rapid Transit (BRT) system along the Ring Road. The BRT…
Egyptian-French consortium to operate BRT buses on Ring Road
Egypt
May 11, 2021
Egyptian-French consortium to operate BRT buses on Ring Road
The Egyptian Transport Ministry signed an MoU on Monday with a consortium led by the French company Transdev to prepare technical…